skip to main content









Donation Heart Ribbon

Green Light For Cross-Border Power Line Between U.S. And Mexico

Enlarge this image

Above: These mountains in Baja California may soon be covered with wind turbines.

The Department of Energy announced Friday that the Obama administration has given the go-ahead to connecting wind turbines in Baja to the U.S. grid. According to Friday's Federal Register, the administration has granted "a Presidential permit to Energía Sierra Juárez U.S. Transmission, LLC (ESJ), to construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line across the U.S.-Mexico border in eastern San Diego County, California." The line would be 1.7 miles long, less than a mile of which will be in the U.S.

Read the full article at KCET.

To view PDF documents, Download Acrobat Reader.

Please stay on topic and be as concise as possible. Leaving a comment means you agree to our Community Discussion Rules. We like civilized discourse. We don't like spam, lying, profanity, harassment or personal attacks.

comments powered by Disqus